Laserfiche WebLink
• I_%Illbl'I' I1 _ k.~c1nA;~ n Plan <br />1, Description -. of how will handle overburden <br />Overburden will not enter into the reclamation. <br />2. Tnlckness of top soil to he replaced: <br />6 to 8 inches. <br />3. Describe Gradient of reclaiioed elope. <br />No slope will be left steeper then 4H to 1V. <br />4. Dessribe seeding operation <br />Seed ing will be with a grass drill. Ground will be smoothed <br />and prepared for seeding. <br />5. Describe Grass, forb, shrub and tree specie: <br />Grass seed will be both buffalo and gramme. No trees <br />will be needed. None in the area. <br />6, Describe the application sl,eakl~ai aethod of aeedinG <br />See #4 <br />~. Describe the mulch: <br />Fertilizer will be applied prior to mulching. Mulch will <br />be wiiinnth native s traw, which will probably be anchored by <br />B. DeaoTib~~ an roads streams do <br />7 , ponds that will remain: <br />There will be none. <br />9. Describe how any left over rock etc, will be handled. <br />Any rock or other unsiGhtly objects will be buried <br />prior to the grading and seeding operation. <br />10. Financial warranty for private operators: <br />N~ <br />Y <br />