Laserfiche WebLink
<br />• 12. "Measures to minimize disturbance to <br />ante, prevent off-site drainage and <br />configuration of the reclaimed area <br />proposed future land use." <br />The hydrologic balance <br />A stable configuration <br />backsloping of the pit <br />boundaries. This will <br />the east perimeter of <br />immediately to the sou <br /> <br />the hydrologic bal- <br />provide for a stable <br />consistent with the <br />issue has been addressed <br />will be accomplished by <br />face on the north, east <br />be flatter than existing <br />the permit area on the <br />th . <br />earlier. <br />the 3H:lU <br />and south <br />slopes on <br />operation <br />13. "Specify whether the deposit/ore will be processed <br />on site." <br />As stated in S.d above, "The applicant proposes to have a <br />custom crusher move in a portable crushing and screening <br />plant to process material to meet market demand." The <br />aggregate body will be crushed, screened and stockpiled <br />to various sizes of construction aggregates by the por- <br />table plant. Aggregate will be extracted by front-end <br />loader and fed directly to the crusher spread. No wash- <br />ing, concrete or asphalt mixing, leaching or milling is <br />contemplated on site. No chemicals will be utilized, and <br />no structures are proposed on site. <br /> <br />• <br />