Laserfiche WebLink
fee[ per second as the limiting velocity value, which is the most conservative velocity value in the <br />manufacturer's literature. <br />TABLE 3 <br />Turf Reinforcement Mat Performance Guide <br /> Permissible Sheer <br /> Permissible Velocity <br /> Stress <br /> Manning's (fps) <br />Product Manufacturer « ~~ Ibs/ft <br /> n <br /> <br /> Bork Vegetated Suit Vegetated <br /> <br />P300 North American Green 0.034 9.0 16.0 3.0 8.0 <br />SC250 North American Green 0.040 9.5 15.0 3.0 10.0 <br />C350 North American Green 0.041 10.5 20.0 3.2 12.0 <br />P550 North American Green 0.041 12.5 25.0 4.0 14.0 <br />CFP-12 Greenfix America 0.024 12.0 4.5 <br />CPG- 3000 Greenfix America 0.024 20.0 10.0 <br />Enkaina[ <br /> Colbond Geosynethetics 0.030 20.0 19.0 6.7 8.0 <br />7010 <br />Enkamat <br /> Colbond Geosynethetics 0.030 20 19 ll.2 9.0 <br />7018 <br />Enkamat <br /> Colbond Geosynethetics 0.030 13.0 19.0 11.2 10.0 <br />7020 <br />Notes: 1) This is a select list of products; SCC may use another equivalent product if the performance <br />criterion meets the minimum standards. <br />2) The manufacturer's product-specific performance properties are documented in Attachment <br />B, Turf Reinforcement Mat Design and Installation Information. <br />3) Mannin~'s "n" values are based on bare soil conditions with a flow de th of 0.5 feet. <br />Channel capacity was analyzed using the vegetated channel sub-routine. The channel roughness <br />coefficient is automatically calculated by the model. The limiting velocity value was hand entered <br />(manufacturer's published limiting velocity values for the TRM products axe summarized in <br />Table 3). The designs assume a mixed grass community, 6 - 10-inches tall, which corresponds to <br />a "C" retaxdance class, and results in a higher surface water elevation. <br />The TRM lined part of Channel PL-1 will be three (3) wide. Side slopes will be 4H:1V. <br />TRNI installation will be in accordance with recommendations developed by the Erosion Control <br />Technical Council (ECTC, 2006) or the individual manufacturer's recommendations. <br />General installation steps axe as follows: <br />1. Prepare a stable and firm soil surface free of large rocks and other obstructions. Apply <br />appropriate seed mixture. , <br />2. Install TRM after application of seed, mulches (if applicable) and other soil amendments, <br />unless soil in-filling is required. If soil in-Filling is needed, install TRM, apply seed and <br />other amendments and brush or rake topsoil into TRM matrix. <br />Old Wolf Creek Area Remediation Plan 6 Revised 06/07 <br />