Laserfiche WebLink
<br /> <br />RANDY PERDUE CONSTRUCTION MATERIAL LIMITED IMPACT <br />(110) OPERATION RECLAMATION PERMIT APPLICATION <br />EXHIBIT D -RECLAMATION PLAN <br />a) As each approximate I acre strip of quarried area is completed, that area will be <br />reclaimed during the opening of the next strip to be quamed adjacent thereto. The <br />estimated volume of material for reclamation purposes is approximately 27,000 yd'. <br />Please note that this is a volume of material that will be used [o reclaim the previous pit <br />upon opening a new one, and not to reclaim the entire quarry sight. Each new pit should <br />produce 27,000 yd' of overburden [hat will be immediately used to reclaim the previous <br />pit. The push distance for overburden and topsoil is approximately 20 ft. <br />b) The affected area is fairly level; therefore, the Operator/Applicant does not anticipate that <br />the maximum gradient of the reclaimed slopes will exceed 3:1 (horizontal vertical). It is <br />anticipated that the process of reclamation will be to backfill the quarried area. <br />I~'ft-t~iNtN(r <br /> <br />~~ 9 <br /> <br /> <br /> x <br />c) Revegetation of site: <br />f ~'T- ~ t W I ~1G.- <br />i) The Operator/Applicant intends to move the soil from the next strip to be quarried <br />onto the strip being reclaimed in order to maximize the use of live native seed. It <br />is estimated that the entire approximate 36" to 60" of soil will be reclaimed. <br />ii) All necessary seeding, in addition to the live native seed, will take place during <br />the spring season to maximize seed germination. To the extent additional soil <br />preparation is required after the soil is moved from the current strip to be quarried <br />to the strip to be reclaimed, the soil will be disced or raked. The seeding will be <br />accomplished in accordance with the weather, preferably early enough in the <br />season for sufficient moisture. The soil composition is sufficiently rich to make <br />fertilizer application unnecessary. <br />iii) In addition, the reclaimed area will be seeded with a pure live seed mixture of <br />Sloes wli II t~F ~,t'cctol 3: I <br />