My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121272
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:42 PM
Creation date
11/25/2007 9:13:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007014
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Doc Name
New 112c Appl
From
Larsen Colorado LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i• <br />Exhibit L -Reclamation Costs <br />(2) Estimate of Reclamation Costs <br />As described above, available portions of the pit floor will be reclaimed as mining progresses. <br />However, should no reclamation be done until the pit has been mined out, the costs of reclaiming <br />the entire affected area, 104 acres not just the pit floor and stockpile/crusher area, have been <br />estimated here. Because the benches created for mining will follow the recommendations for pit <br />slope stability as provided in Attachment 6.5-1, no additional costs are anticipated to be required <br />to ensure pit wall stability. The cost of removing plant growth medium prior to disturbance is <br />accommodated within the costs of mining. <br />The costs of spreading plant growth medium, seeding, and hydromulching, following the <br />guidelines presented in Attachment E-1 (the recommended revegetation species list and <br />husbandry guidelines provided by the local N.R.C.S. Conservationist) have been estimated using <br />a contractor from the Colorado Springs area. <br />Estimated Reclamation Costs for 104 Acres of the Byzantine Quarries 112 Operation-Using_a <br />Bid from an Independent Contractor in the Colorado Springs Area. <br />• <br />Item Costs <br />Mobilization (equipment and personnel) $ 750.00 <br />Top Soil Placement $65,000.00 <br />Soil Prep Fertilizer and Till $13,000.00 <br />Broadcast Seeding $49,400.00 <br />Hydromulching $59,800.00 <br />Total Estimated Reclamation Costs $187,950.00 <br />Note: This bid is available from the applicant upon request. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.