Laserfiche WebLink
Geotechnical <br />• "Include any geotechnical investigation,design, and construction <br />requirements." (Appendix XX). <br />Operation and maintenance <br />"Describe the operation and maintenance requirements for each struc- <br />ture." (see Sections 4.05.5 and 4.05.6). <br />Timetable <br />"Describe the timetable and plans to remove each structure, if <br />appropriate." <br />The structures will be removed after mining is completed. They <br />should remain for the life of the operation. <br />• iii. LARGE SEDIMENT PONDS <br />This is not applicable for the plan does not call for iarge sedimen- <br />tation ponds. <br />(b) Sedimentation Ponds <br />This is not applicable for no ponds will be left permanently. <br />(c) Permanent and Temporary Impoundments <br />Permanent and temporary impoundments are listed in Appendix XXI and <br />Exhibits 2.05.3-E through 2.05.3-I. <br />(d) Diversions <br />• <br />2.05-39 <br />n ~~ ~ J <br />