Laserfiche WebLink
Engineer <br />• "Be prepared by, or under the direction of, and certified by a <br />qualified registered professional engineer." The plans were prepared and <br />certified under the guidance of Robert Rogers (P.E.) from Cooper and Clark <br />Consulting Engineers, Englewood, Colorado. <br />Structures <br />"Contain a description and map, prepared according to Section 2.10, <br />and cross-section of the structure and its location." (see exhibits <br />2.05.3-E through 2.05.3-I). <br />Hydrologic and geologic information <br />"Contain preliminary hydrologic and geologic information required to <br />• assess the hydrologic impact of the structure." (see Appendix XXI). <br />Subsidence <br />"Contain an analysis describing the potential effect on the structure <br />from subsidence of the subsurface strata resulting from past underground <br />mining activities." (see Appendix XXVII). <br />Certification Statement <br />This will be provided to the Division as applicable. <br />ii. DESIGN PLAN <br />Each detailed design plan for a structure shall: <br />Engineer <br />• The design plan will be prepared by qualified professionals. <br />2.05-38 <br />