My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121225
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:40 PM
Creation date
11/25/2007 9:12:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Section_Exhibit Name
Tab 1 Permit Summary
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A 60-inch reclaim conveyor, housed in an inclined concrete tunnel <br />will be used to transport coal (4,000 tons per hour) from the <br />unloading hopper to a rubber-tired radial stacker. <br />• The radial stacker will feed a 30-foot high, 30,000 ton stockpile. <br />The loading system will include the following components: <br />• A tracked dozer will take the coal from the stockpile and push it to <br />the existing truck-dump hopper. <br />• The existing hopper reclaim conveyor will transport coal (1,500 tons <br />per hour) through the existing crusher building (with crusher <br />replaced with a coal chute) to the existing, but relocated loadout <br />conveyor, which mill feed the loadout building (relocated and <br />refurbished with a 75-ton loading bin). <br />As part of this project, the existing crusher building will be refurbished <br />- the crusher will be removed and replaced with a coal chute. The loadout <br />conveyor will be refurbished and relocated from the existing stack tube <br />reclaim tunnel to the crusher building. It will be used to elevate coal <br />from the crusher building to the top of the loadout structure. The loadout <br />structure will be refurbished and moved to the new, proposed location. <br />Haul road HGLF HR2 will be re-aligned and constructed as the haul truck <br />corridor. <br />The existing stack tube, stack tube reclaim tunnel and crusher conveyor <br />will be demolished. <br />Since CDMGs approval of the original permit application (Permit C-92-081) <br />in May 1993, HGTI has submitted several technical revisions (TR), minor <br />revisions (MR) and permit renewals (RN). A brief summary of the revisions <br />follows. <br />TR-O1 - Responses to Stipulations 2 and 3 attached to Permit C-92-081. <br />The TR was submitted July 22, 1993 and the proposed decision to <br />approve was issued on April 27, 1994. <br />MR-O1 - Change of Operator and Update Tab 3, Adjudication File. The MR <br />was submitted July 25, 1994 and the proposed decision to <br />approve was issued on August 22, 1994. <br /> <br />TR-06 9 Revised OS/OS <br />