My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121221
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:40 PM
Creation date
11/25/2007 9:11:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977094
IBM Index Class Name
Permit File
Doc Date
1/25/1979
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />is ryas ~ -^evi3 e~ . <br />sl.~GwL,~ s~~ -~ ~ ~~ <br />EXkIBIT E ~/K~ l V'l <br />~----- <br />Reclamation Plan <br />The area that is affected at the present time has 4 <br />• stockpiles of usable gravel. The remaining mined area <br />rill be used for future stock piles. Two of these piles <br />will be eliminated around April, but-the area rill be , <br />needed for the other piles so I see no reclamation to <br />take place for approximently 2 years. <br />•We_will continue to stock .pile the top soil to- <br />wards the west end of the mina xhere xe have 2 piles <br />already. The top soil is removed by scrappers or our - <br />D-B Cat and hauled to the existing piles or pilaf in: a <br />nex pile. Looking on the mining timetable, you see that. <br />we mined right dozen the middle. We are starting to mine <br />in the phase one block at the present time. When xe have <br />the phase one and txo complete and most of the stock piles •' <br />are removed xe will reclaim these areas before entering <br />the phase-three area. So everpthins west og phase 3 & 4 <br />x111 be reclaimed in.an orderly fashion before their <br />mined and,xill continue in a zest to east pattern.///_ <br />First, our scrappers x111 bring in a fill materiaYto <br />. fill in the holes and graduate-out the steep slopes of . <br />_ the mining perimeter to be not g=eater than 1-3. We <br />then"rill.place 6-i2" of topsoil over the relamed area <br />which x111 be taken from the stockpile and some from the <br />phase three area which xe x111 be getting ready for mining <br />by our scrappers. Since xe've also been in the farming <br />business for 20 years, we will be very carefull xith the <br />placing of topsoil so there rill be very little, if any <br />conditions for soil erosion. When this is done, the seed <br />bed will be prepared by pulling a 20' off set disc over <br />' .. ~.: ', <br />~~. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.