Laserfiche WebLink
• CATERPILLAR INC. <br />FLEET PRODUCTION AND COST ANALYSIS <br />CDMG - II-W RN #02 SCC 19-APR-1 Page -43- <br />-------------------------------------------------------------------------------- <br />Cost Summary --L TS REPL - FF <br /> CDMG - II-W RN #02 17,062 TONS <br /> ------------ -------- <br />ICost per Hourl ----------- --- <br />Operating ---------- -- ------- <br />$ per <br /> I Equipment Qty Model I (each unit) I Hours <br />-------- --- $ Total <br />---------- -- TON I <br />------- <br /> ------------ <br />I Loaders -------- I O O 0.000 I <br /> ------------ <br />I Haulers --------------- <br />4-637E - ------------- <br />I 225.62 I ----------- --- <br />28 ---------- -- <br />6,287 ------- <br />0.368 I <br /> I I O O 0.000 I <br /> I <br />I Total <br />4 I I <br />I I ------- I-- <br />28 --------- I- <br />6,287 ------ I <br />0.368 I <br /> ------------ <br />I Support # 1 --------------- <br />1-14G - ------------- <br />I 99.56 I -------- <br />2 <br />173 -- ------- <br />0.010 I <br /> I 2 1-W. WAG I 169.38 2 I 295 0.017 I <br /> I 3 I 0 I O 0.000 I <br /> I 9 0 I O 0.000 I <br /> I 5 0 I O 0.000 I <br /> I 6 I I 0 I O I 0.000 <br />• I <br />Total <br />2 I I <br />I I ------- <br />4 I-- <br />I --------- <br />468 I- <br />I ------ I <br />0.027 <br /> ------------ <br />Fleet Total --------------- <br />0 - ------------- <br />I I ----------- --- <br />32 ---------- -- <br />6,755 I ------- <br />0.396 I <br /> Productivi ty and Cost --I, TS REPL -FF FPC-lc2 <br /> ------------ -----Loader Hauled----Hauler2- ---Pot ential Production--- <br /> I Qty ~ Model 4-637E I TONS /Hour Avg MPHI <br /> I BCY /Load 1 2,518 Lbs/BCY). 25.62 I I I <br /> I Hauler - Pa yload, TONS.... ... 32.25 1 637E 2,951 5.2 I <br /> I - 8 of Max GVW .... ... 94.4 I I I <br /> ~ Load Time, Minutes ....... ... 1.00 ~ ------ ------------- ------- <br />I I <br />I I <br />I I <br />I I <br />----------------Hauler Cycle Time---------------- <br />Load ........................ 1 .00 <br />Haul . ........................ 0 .62 <br />Dump and Maneuver............ 0 .60 <br />Return ....................... 0 .91 <br /> Potential Cycle Time.. 2 .62 <br />Wait on Slow Hauler.......... <br />I Wait to Load.[BUnching-AVG ]. 0 .00 <br />I Total Cycle Time...... 2 .62 <br />r ~J <br />I <br />----Operating Schedule---- <br />I Operator Efficiency 8361 <br />I Sched Hrs/Year 1,500 I <br />-------------------------- <br />-----Fleet Estimates------ <br />I Fleet Availability 100.OBI <br />I TONS /Sched Hr 2,499 I <br />I Total TONS 17,062 I <br />I Sched Hrs Reqd 7 I <br />I Total $ 6,755 I <br />I $ per TON 0.396 I <br />I TONS /Year 3,673,741 I <br />I Years Required 0.00 I <br />__________________________ <br />25-2-44 Revised 04/01 <br />