My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121024
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:32 PM
Creation date
11/25/2007 9:01:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
9/12/2006
Doc Name
As-Built Report Sediment Pond 008
Section_Exhibit Name
Tab 07 Appendix 7-6f.1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Principal Spillway <br />Emergency Spillway <br />,.~ <br />TABLE 3 <br />Spillway Data Summary <br />Sediment Pond OOS <br />Type <br />Orifice Diameter . <br />Inlet Elevation <br />10-year, 24-hour <br />Peak Stage Elevation . <br />Type . <br />Barrel Diameter. . <br />Riser Diameter . <br />Length of Barrel . <br />Vertical Head Drop . <br />Entrance Loss Coef . <br />Bend Loss Coef . <br />4!ier Coef <br />Orifice Coef . <br />Manning Coef . <br />Inlet Elevation <br />25-year, 24-hour <br />Peak Stage Elevation . <br />Riser Inlet (CMP) <br />6.00-inch <br />7011.4 <br />7013.& <br />Drop Inlet (CMP) <br />24.000-inch <br />24.OD0-inch <br />120.000-ft <br />16.2 -ft <br />1.000 <br />0.500 <br />3.100 <br />0.600 <br />0.025 <br />7015.0 <br />7016.7 <br />• <br />The entrance to the emergency spillway is located 3.6 feet above the • <br />principal spillway. There will be no flow through the emergency spillway <br />inlet as a result of the .runoff from a 10-year, 24-hour precipitation <br />event or less. See Figure 1 for explanation of above. <br />Pored 008 is designed to safely pass the runoff from the 100-year, 24-hour <br />precipitation event without overtopping the dam. The top of the dam <br />elevation (7019.1} is 1.7 feet above the peak stage elevation of 7017.4. <br />CONSTRUCTION PLAN <br />rs3= <br />Site Work Prior to Embankment Construction <br />The embankment construction area v.~as dewatered as much as practicable to <br />allow heavy equipment to operate in the area. To accomplish this, a <br />dewatering trench or trenches was excavated with a small backhoe. A pump <br />was set ir, the trench to lower the local water table. Peabody received a <br />Construction Gewatering Wastewater Discharge Permit from the Colorado <br />Department of Health. This permit allowed Peabody to discharge this water <br />away from the construction activities while maintaining water quality. <br />7-6f.1-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.