My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120969
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:30 PM
Creation date
11/25/2007 8:58:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998067
IBM Index Class Name
Permit File
Doc Name
Patton Clay Mine Inspection
From
LJ Development Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit E -Reclamation Plan -Item (d). <br />(d) As stated eazlier, topsoil will be segregated and stockpiled. There will be no spoil to be <br />compacted or graded. The proposed SCS recommended seed mix is: <br />~ecies Varie #/A PLS <br />Blue Grama Covington 1.8 <br />Side Oats Vaughn 5.4 <br />Little Bluestem Camper or Native ~, 8 <br /> Total 10.00 # <br />The seed will be planted by a grass drill with competent agitator or will be broadcast. The seed <br />houses in the azea have an adequate supply of these varieties. Late Fall seeding is recommended and <br />has proven most successful. If Fall planting is not possible, the seed will be planted in eazly Spring. <br />s. (e) Schedule.indicating how and when rcclamation will be implemented... <br />(I) (ii) (iii) Estimate of periods of time required for various phases of reclamation, size and <br />location, sequence. <br />Phase crea a Mining Time <br />Patton Lease 7.3 15 yeazs + <br />BLM Lease 49.4 40 yeazs + <br />Patton Lease 65.3 40 yeazs + <br />BLM NW Lease 9.0 15;Pass + <br />Reclamation Completion <br />5 years after each phase <br />« ,~ « <br />« « <br />« >, «. <br />This is a best estimate at this time. Refer to CRS 34-32.5-112 (b) (VIII) regazding commitment to <br />time schedule. <br />(F') Description of each of the following: <br />(1) Final grading <br />The pit floor will be left as level as possible to conform with sunrounding contours. Backslopes will <br />be finished to be compatible with surrounding contours. <br />(2) Seeding types, mixture, quantities, time of seeding <br />See (d) above. <br />(3) Fertilization type, mixture, quantities and time of application <br />Not recommended by NRCS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.