Laserfiche WebLink
B <br />PART I <br />Page 7 <br />Permit [Jo. COC-350000 • <br />EFFLUENT LIitITATIONS AND MONITORIIJG REQUIREMENTS <br />2. stormwater Management Plan (continued) <br />In the areas of coal mining facilities directly regulated by effluent <br />limitations, it is expected that, through actions directed at <br />achieving compliance with these limitations, the permittee will <br />effectively control most site stormwater discharges. However, in <br />other areas, this may not be the case. Some of the discharges are <br />outside the coverage of the diversion ditches and sedimentation ponds <br />required under the facility's Colorado Mined Land Reclamation Division <br />(CMLRD) permit. Examples of such areas are roads and railroad Lines <br />used for transportation to and from the site, oucslopes of ponds, <br />inactive loadoucs, sites used for storage and maintenance of material <br />handling equipment and areas granted small area exemptions. <br />The plan shall describe all areas that have nor been previously <br />permitted, but meet the definition of a stormwater discharge in 40 CFR <br />122.26, and shall include a map (or maps) denoting the affected <br />areas. The map(s) shall show the location of the discharge(s) or <br />drainage areas and indicate the receiving waters. The map(s) shall <br />label each stormwater oucfall with a three digit number beginning with <br />the next number afcar the last numher assigned co surface runoff <br />outfalls. <br />The plan shall describe the controls and/or procedures [hat <br />specifically address the goal of minimizing or elimiracing the <br />pollution from Chest scurces. T_n some cases, this may entaLi <br />construction of physical facilities. In ocher cases, it may entail <br />developing new methods of operation or material handling and/or <br />replacement of materials with those that are less polluting. The <br />permittee shall make the appropriate determinations and receive the <br />appropriate approvals from [he CMLRD. <br />Where necessary, the plan shall include a schedule of activities <br />and/or construction witb a reasonable timetable for implementation of <br />any new operations or construction of new facilities necessary to <br />achieve the required goals. The timetable shall allow for attainment <br />of operational level as expediently as possible, but in no case after <br />June 30. 199.5, in conformance with Part 402(p)(4)(A) of the Federal <br />Clean Water Act. The Division will ensure chat no proposed timetable <br />is excessively Lengthy. <br />Specific Requirements; <br />a) A cove of the elan shall be kept on-site and shall be readily <br />available to all personnel involved with compliance with the plan. <br />b) The plan shall contain a statement of certification, signed by top <br />management, supporting compliance with the stated goals. <br />• <br />c) Records pertaining to implementation of the plan shall be kept in <br />a log and made available on request to Division, CMLRD and EPA <br />representatives (see Part [.C.4.). <br />