My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120953
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120953
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:29 PM
Creation date
11/25/2007 8:57:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Permit File
Doc Date
7/29/1996
Doc Name
JUNE 1996 MONTHLY REPORT 2ND QUARTER REPORT & DMRS FOR CDPS PN CO-0044768 MINE REMEDIATION PROJECT
From
SUNNYSIDE GOLD CORP
To
WQCD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />June 1996 Monthly Report/2nd Quarter Report <br />Page 4 <br />Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br />This project is to be carried out on MLR permitted lands. A <br />Technical Revision (TR) was submitted and approved ors May 30, <br />1996. <br />A San Juan County Land Use Permit was obtained to implement <br />this project. <br />Application was made to the EPA for an Underground Injection <br />Control (UIC) Rule Authorization to implement this project. <br />The Rule Authorization was approved for this project: on June <br />26, 1996 (EPA File #CO5000-03745). <br />Pre-implementation site pictures are attached for this <br />project. The equipment to be used is on-site. <br /> <br />Cement Creek Diversion and W~Yter Treatment <br />`a, s . <br />Y. .;, <br />This project is to be carne ~ tit on MLR perm tted lands. A <br />TR was submitted and approved'~.~pn• May 30, 199f~ <br />A San Juan County Land Use Permit was obtained to implement <br />this project. <br />The U.S. Army Corp of Engineers inspected the site for this <br />project and an application for a Section 404 permit i:o install <br />a diversion in Cement Creek was applied for. It wars approved <br />on June 20, 1996. <br />Construction of the pipeline bench was started during June on <br />this project. <br />Pre-construction site pictures are attached'for this project <br />as well as quarterly construction progress picture:. <br />Mainstem Stream Monitoring and Reference Point Stream <br />Monitoring <br />The first set of monitoring results of the three mainstem <br />streams {Animas River {A-68), Cement Creek (C-48) and Mineral <br />Creek (M-34) are attached. <br />These samples were taken on June 18, 1996. These sites will <br />be monitored every other month in lieu of site monitoring at <br />the Boulder Creek Tailings project, Eureka Tailings project <br />and Pride of the West Tailings project. <br />Flows are provisional based on USGS stream gage readings and <br />the current flow rating charts. <br /> <br />`R ~ ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.