Laserfiche WebLink
~ ~ ~,~ <br />June 1996 Monthly Report/2nd Quarter Report <br />~ Page 2 <br />Columbu~» Mine Portals - Mine Waste Dumps <br />This is a "S" list project and no work has been done to <br />implement the work plan. A portal discharge sample was taken <br />during the month for confirmation of previous data. <br />Surface Mill Tailings at Eureka <br />Access permission to perform this project was received from <br />owners other than Sunnyside Gold Corporation (SGC). On June <br />14, 1996 SGC submitted documentation of its legal right to <br />enter this property for performance of the remediation <br />project. <br />The site was inspected by the U.S. Army Corps of Engineers and <br />it was determined that a Section 404 was required for this <br />project. A Section 404 a ~li¢ation for this project was <br />applied for and was receive~,gt~'~nne 28, 1996. <br />A San Juan County Land Use P'exmit for this project has been <br />approved. Implementation of tie work plan for i~his project is <br />planned to start in July. , <br />Pre-remediation pictures are attached for this project. <br />Gold Prince-Mill Tailings <br />A San Juan County Land Use Permit for this project was applied <br />for. This project was referred to the Historical Review <br />Committee for determination of the remediation plan's impact <br />to the historical and cultural value of the site. The site <br />was inspected by the Historical Review Committtee and <br />recommendations were made to minimize reclamaEion efforts at <br />this site due to the historical value. The next review stage <br />will be an appeal to the Planning Commission to review the <br />recommendations of the Historical Review Committee for final <br />recommendations to the San Juan County Commissioners. <br />This site will need a Section 404 permit to implement: the work <br />plan. A site inspection is scheduled for July- and the work <br />plan was submitted to the State Historical Preservation <br />Officer (SHPO) for review as required for 404 permitting. The <br />SHPO recommended further site characterization to determine <br />whether the site qualified for the National Register or if the <br />work plan might impact Site 5SA121, the Sunnyt;ide Mine <br />1 Complex, which is nearby. <br />It was determined by the San Juan County Commissioners that <br />the portion of the work plan dealing with the tunnel. bulkhead <br />could be implemented without a Land Use Permit. <br />Monitoring samples were taken at this site and will be <br />~ included in the July report. <br />`~ Pre-remediation site pictures for this project are attached. <br />y: <br />f <br />