My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120949
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:29 PM
Creation date
11/25/2007 8:56:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007013
IBM Index Class Name
Permit File
Doc Date
2/16/2007
Doc Name
New 112c Appl
From
McAtee Construction Co.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ftti 1 0 [UUl EXHIBIT L <br />RECLAMATION COSTS oivisionofReraamation, <br />Mining and Safety <br />This reclamation cost estimate in based on the assumption <br />that there will be no more that 20.00 acres ± disturbed at any <br />one time. The following information also depicts a worse case <br />scenario. At that time we will have to respread 16,133.33 cubic <br />yards of topsoil, do 1,085 cubic yards of cut/fill dozer work, <br />and revegetate 20.00 ac. ±. The table below outlines the various <br />areas of disturbance at that time. The amount of topsoil that <br />will be re-spread is based on an average of 6 inches. A D-8N <br />dozer will be used to do all of the dirt work. These figures are <br />then used in the calculations for the bond amount. The <br />revegetation cost figure includes fertilizer, grass seed, mulch <br />and drilling costs. <br />STAGE TOTAL SOIL DEPTH <br />NEEDS REBOILING 18.75 4" <br />NEEDS SEEDING 20.00 <br />RIPPING SHALE 13.88 <br />SLOPE CUT/FILL 840 LINEAR FEET <br />REBOIL @ 4" 10,833.33 CUBIC YARDS <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />Unit Cost <br />1. Revegetation includes grass seed mix and <br />labor to drill $500.00/AC. <br />2. Re-spreading soil and/or growth media with <br />D-9 cat, push distance less than 100 o.4o/Yn' ~i <br />3. Sloping using cut/fill method <br />D-9 cat, push distance less than 70 o .26/YD' li <br />4. Grading and shaping seed bed using a <br />1406 mOtOf grader $49.24/AC. ~~ <br />RECLAMATION COSTS <br />1. Revegetation, 20.00 ac @ $500.00/ac $ 10,000.00 <br />2. Resoiling, 16,133.33 yd' x $0.40/yd3 6,527.23 <br />3. Sloping using cut/fill method <br />1,085.00 yd' x $0.26jyd3 285.62 <br />4. Grading and shaping 20.00 ac @ $49.24/ac. 984.88 <br />Net Total $17,797.73 <br />5. Indirect costs <br />Mobilization 2,581.17 <br />Insurance, Bond, & Profit 2,326.16 <br />6. Administration costs 1.389.89 <br />TOTAL ESTIMATE $24,094.95 <br />RECOMMEND BOND BE SET AT $24,100.00 <br />1/ Figured using Cat Handbook and rental costs from local sources for 93& <br />efficiency, for eastern Colorado. <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.