RXHTBTT D (CONTINUED) <br /> How each area will be mined and the constraints on each area is <br /> briefly explained below: <br /> Area 1 - <br /> This area will be wet mined and backfilled with sand spoils . <br /> Approximately 8, 000 cubic yards of topsoil/overburden will be <br /> stored and temporarily revegetated in the 25 ' setback area <br /> along the east side of this area and the south side of Area 2A <br /> for later permanent revegetation. <br /> Area 2C and Slurry Wall - <br /> • The slurry wall and the South Platte River channel <br /> improvements will be installed in the areas shown on the <br /> accompanying map as soon as the relevant approvals are <br /> obtained. <br /> • Areas 2A and 2B - <br /> Mining in these areas will commence with the stripping of <br /> topsoil/overburden. From Area 2A, approximately 8, 000 cubic <br /> yards will be stored and temporarily revegetated in the 25 ' <br /> setback area with the stored material from Area 1 for future <br /> later permanent revegetation of the banks and periphery areas <br /> of the future reservoir. From Area 2B, approximately 55, 000± <br /> cubic yards will be stored along the south 25 ' setback of that <br /> area to potentially revegetate the entire 34: acres of Area <br /> 2B, although this area will be filled with sand spoils as much <br /> as possible . These two topsoil/overburden storage areas will <br /> remain to the end of mining to act as a permanent reserve for <br /> revegetation. In the worst case, if approvals haven' t been <br /> obtained for wet mining on Area 1, for the slurry wall, and <br /> for construction of channel improvements, mining to the water <br /> table may be initiated in these areas while the relevant <br /> approvals are being obtained for these three items . <br /> 0 Areas 3 , 4, and 5 - <br /> These areas will be mined last . As much as possible, <br /> topsoil/overburden will be immediately used in mined areas to <br /> build the required slopes of the reservoir and for <br /> 40 revegetation of the banks/periphery areas . Topsoil/overburden <br /> may also be temporarily stored on the future berm along the <br /> South Platte River, and/or in other 25 ' periphery setback <br /> areas . <br /> • <br /> 0 <br />