Laserfiche WebLink
<br /> <br />5) Exhibit S does not contain permission for the Operator to be within 200' of the power line <br />which runs the length of the pit. Until such specific written permission is obtained, or a <br />geotechnical study proving that there would be no significant damage done to the power fines is <br />submitted, the Operator must remain 200' away from the power lines. This is in accordance with <br />Rule 6.4.19. <br />Please be advised that applications may be deemed inadequate, and M-98-024 may be denied on <br />June 25, 1998, unless the previous adequacy review items aze addressed to the satisfaction of the <br />Division. Please respond to these concerns well in advance of the due date, so DMG can make a <br />decision regazding your application prior to June 25. <br />If you have any further questions, please contact me at (303) 866-367. <br />Sincerely, <br />,. .. ,. ~ Ir/, <br />~~~, <br />Christina L. Kamnikar, <br />Environmental Protection Specialist <br />cc: Cazl B. Mount, DMG <br />Greg Lewicki, Lewicki & Associates <br />