My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120833
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:25 PM
Creation date
11/25/2007 8:50:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981132
IBM Index Class Name
Permit File
Doc Date
9/8/1981
Doc Name
VALCO LAMAR CONCRETE DIV LAMAR WEST PIT FN 81-132
From
MLR
To
BUCK BARNHART
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Buck Barnhart <br />September 8, 1981 <br />page -4- <br />example, topsoiling costs for operations of this magnitude are one dollar <br />per acre. Seeding costs, especially if trees are to be planted, will be <br />considerably more than $10.00 per acre. ($150.00 per acre being more typical). <br />Reestablishing the slopes of the lake will entail backfilling as well as <br />grading and thus may cost more than $250.00 per acre. <br />3) Considering the necessity for recalculating the bonding costs (as I have <br />mentioned above) and the possible change to the reclamation plan (due to <br />changes in reclamation planting, for example), I feel that a considerably <br />higher bond will be necessary for this operation. Typically major distur- <br />bance is bonded at a rate of no less than 1,000.00/acre. <br />Exhibit M <br />.How does the legal description given in the special use permit relate to the <br />X legal description given for this permit application? <br />Exhibit N <br />,/ Will a fugitive dust control permit be required for this operation (from the <br />J~ Colorado Dept. of Health)1 <br />I have tried to be comprehensive in my review of this application. Many of <br />my questions and comments are points of clarification. Thus, 1 feel that <br />[his application can be ready for the Sept. 23-24 meeting. If you have any <br />questions cancerning anything in this letter, please call me. I will be in <br />the field on Thursday and Friday of this week, but will be in the office all <br />of next week. <br />Sincerely, <br />~, <br />Mark S. Loye <br />Reclamation Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.