Laserfiche WebLink
2.05.2 <br />(2) OPERATION DESCRII'TION. A GENERAL DESCRII'TION AND <br />APPROPRIATE MAP(S), PREPARED IN ACCORDANCE WTI'H 2.10, <br />DESCRIBING THE AREA OF LAND TO BE AFFECTED OVER THE LIFE OF <br />THE OPERATION, ACCORDING TO THE ANTICIPATED SEQUENCE OF <br />MINING AND RECLAMATION, AND IDENTIFYING EACH AREA OF LAND <br />FOR WffiCH Tl' IS ANTICIPATED A NEW, SEPARATE, FIVE YEAR PERMIT <br />WILL BE OBTAINED AND A PERFORMANCE BOND WII.L BE POSTED <br />THROUGHOUT THE OPERATION AND ANY CHANGE IN A FACILITY OR <br />FEATURE SHOWN UNDER 2.10 WHICH WOULD RESULT FROM THE <br />PROPOSED OPERATIONS. <br />Mining ceased at the Bowie No. 1 Mme on December 4, 1997. Mining may be reinitiated to <br />recover the east pod coal block. The following discussion provides a historical perspective of the <br />mining that has occurred at the East and West Mines. <br />With issuance of Federal Lease C-37210, rights were obtained to additional "D" coal seam <br />reserves in the 4,998-acre tract. The size, area, and proposed mine design are presented on the <br />Permit Term and Long-Term Mme Planning Map 2-5. <br />• The area which has been mined and the sequence of same is shown on Map 2-5. No mining is <br />projected for the next five year permit term, <br />For the anticipated sequence of reclamation, Section 2.05.4. <br />CJ <br />TR-032 - 5 - 9/99 <br />~/ g/o 0 <br />