Laserfiche WebLink
• 2.05.3 <br />existing Steven's Gulch well field along an existing jeep trail to the West Mine. A 200,000 gallon <br />water tank of conventional welded steel plate type construction on a reinforced concrete <br />foundation was constructed approximately 1,200 feet north of the mine site. Refer to the drawing <br />entitled "Proposed Water Pipeline" in the Mine Facilities Appendix, Volume 8A and a drawing <br />entitled "Structures" found in the Environmental Resources Appendices, Volume 9, for more <br />detailed location and construction information. <br />A steel chute approximately 9 feet wide at the widest point was constructed above the <br />underground conveyor belt between the 2,000 ton surge bin and the rotary crusher at the East <br />Mine. Oversized coal will be dumped into the chute from end dump trucks and fed onto the <br />conveyor belt. The coal may be temporarily stockpiled within a 50' by 30' maximum area of the <br />parking lot east of the chute and loaded into the chute with front-end loaders. The coal will be <br />processed in the rotary crusher as described in Section 2.05.3(3)(b). A detailed narrative and <br />maps describing the location, construction, use, and maintenance of mine facilities at the East <br />Ivfine can be found in Section 2.05.3(3)(b). As stated in that section, some maps are stored at East <br />Mine for inspection by the Division. <br />A detailed narrative and maps describing removal of East Mine facilities can be found in Section <br />2.05.4. <br />• <br />C~ <br />J <br />TR-32 - l8 - 9/99 <br />2/ S/0 ~ <br />