Laserfiche WebLink
<br />COLOWYO COAL COMPANY <br />SOUTH TAYLOR RECLAMATION COST MODEL <br />TABLE S. SEDIMENT CONTROL FEATURES <br /> <br /> <br /> <br />ONDS <br /> <br />VOLUME <br /> <br />REGRADING <br />UNIT COST <br /> <br />REGRADING <br />COST <br /> <br /> <br />CRES UNIT COST FOR TOP SOII, <br />PLACEMENT AND <br />SEEDING FROM FAC[LI <br />AREAS ABLE4 <br /> <br />TOP SOIL, AND <br />SEEDING COSTS <br /> <br /> <br />OTAL COST <br />Section 28 Pond 19,539 $ 1.09 $ 21,298 2.5 $258 $ 645 $ 21,943 <br />Section 21 Pond 14,625 $ 1.09 $ 15,941 2.5 $258 $ 645 $ 16,586 <br />West Ta for Pond 6,435 $ 1.09 $ 7,014 2.5 $258 $ 645 $ 7,659 <br /> $ - $ - $ <br /> $ - $ - $ - <br /> $ $ - $ - <br /> $ $ - $ <br /> $ $ - $ <br /> $ _ $ _ g _ <br /> $ $ - $ <br /> $ $ - $ <br /> $ - $ - $ - <br /> $ $ - $ <br /> $ $ - $ <br /> $ $ - $ - <br />SubtotWSedtmentControlFeatures 40599 8 44253 $ 1935 S 4 788 <br />Revision Date 4/18/07 <br />Table 5 Exh 13A-TS-1 Revision No. PR-02 <br />