Laserfiche WebLink
'_ <br />Isadore Million -2- February 10, 1995 <br />2. Exhibit D <br />a. To better understand your proposed phased mining plan please explain <br />where you intend to stockpile the topsoil during each phase. <br />b. Describe and discuss the setback area and provide the amount of <br />acreage that will not be disturbed. <br />c. Need a more detailed description of the proposed mining plan. Of <br />particular interest is the access road. If you begin mining in the <br />northwest corner of the permit area you will have to maintain an access <br />road through several phased one acre tracts as you work your way to <br />the souWwest corner. This road would be considered a major <br />disturbance for bond determination. <br />d. Will the water seepage pond be filled with water after, or during, <br />mining operations? <br />e. Will irrigation overflow be directed to the water seepage pond during <br />mining and rechunation operations? <br />f. How do you intend to delineate the areas defined as major-moderate- <br />minor disturbance. <br />g. Need a narrative describing the depth of the sand deposit and the nature <br />of the stratum beneath the sand deposit. <br />3. Exhibit E <br />a. How will topsoil be redeposited on the disturbed area? <br />b. What thickness of topsoil will be replaced? <br />c. When will the pit highwalls be graded to 4:1? <br />d. Need a narrative why rangeland was chosen for post-mining land use. <br />e. Need a narrative comparing the elected post-mining land use to other <br />land uses in the area. <br />