My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120568
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:15 PM
Creation date
11/25/2007 8:34:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
8/22/2003
Doc Name
Section 10
Section_Exhibit Name
Volume VII Geotechnical Studies
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M03107GE <br />1.0 INTRODUCTION <br />This report presents the results of the geotechnical engineering <br />study we conducted for the proposed Coal Processing Facility at the <br />Bowie Number 2 Mine located near Paonia, Colorado. The study was <br />conducted at the request of Mr. Jim Stover, J.E. Stover and Associ- <br />ates, in general accordance with our proposal for geotechnical <br />engineering services dated April 23, 2003. <br />The conclusions, suggestions and recommendations presented in <br />this report are based on the data gathered during our site and <br />laboratory study and on our experience with similar soil condi- <br />tions. Factual data gathered during the field and laboratory work <br />are summarized in Appendices A and B. <br />1.1 Proposed Construction <br />It is our understanding that the Coal Processor Facility will <br />include a building structure and a thickener tank structure. The' <br />proposed building will be a steel frame superstructure about <br />seventy (70) by seventy (70) feet and about eighty (80) feet high. <br />1 -The building will be supported on reinforced concrete foundations. <br />. The thickener will be a concrete tank about sixty (60) feet in <br />diameter and ten (10) to twelve (12) feet high. <br />The Coal Processing Facility site will be constructed by a <br />excavation cut and fill material placement technique. The excava- <br />tion cut is proposed to have about a seventy (70) feet high cut <br />exposure and constructed at an inclination of one and one-half <br />(1 1~) to one (1) (horizontal to vertical}, The placed fill will be <br />constructed at an inclination of two (2) to one (1) and will be <br />about twenty (20) feet high. <br />The proposed site development will include a material storage <br />area and haul road which will be constructed from excess excavated <br />material from the proposed Coal Processing Facility site. The <br />material storage area and haul road fill will be constructed at an <br />inclination of two (2) to one (1) and will be about thirty-five <br />(35) feet high. <br />1.2 Scope of Services <br />Our services included geotechnical engineering field and labora- <br />tory studies, analysis of the acquired data and report preparation <br />for the proposed site. The scope of our services is outlined <br />below. <br />• <br />Lambert ana ~,~,oociate,~ <br />CUNtiUU INU UEU fECN NICAI ENUINEEN6 AND <br />MATERIAL tES TINU <br />
The URL can be used to link to this page
Your browser does not support the video tag.