My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120568
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:15 PM
Creation date
11/25/2007 8:34:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
8/22/2003
Doc Name
Section 10
Section_Exhibit Name
Volume VII Geotechnical Studies
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M03107GE <br />material exposed in the foundation excavation should be removed <br />prior to placing foundation concrete. <br />The bottom of the foundation excavations should be compacted <br />prior to placing compacted structural fill or foundation concrete. <br />'~ We suggest the materials exposed be compacted to at least ninety <br />(90) percent of the materials moisture content-dry density rela- <br />tionship (Proctor) test, ASTM D1557. Excavation compaction is to <br />help reduce the influence of any disturbance that may occur during <br />the excavation operations. Any areas of loose, low density or <br />yielding soils evidenced during the excavation compaction operation <br />should be removed and replaced with compacted structural fill. <br />Caution should be exercised during the excavation compaction <br />{ operations. Excess rolling or compacting may increase pore pres- <br />sure of the subgrade soil material and degrade the integrity of the <br />support soils. Loose or disturbed material in the bottom of the <br />foundation excavations which are intended to support structural <br />members will likely result in large and unpredictable amounts of <br />~ settlement, if the loose or disturbed material is not compacted . <br />The bottom of any footings exposed to freezing temperatures <br />should be placed below the maximum depth of frost penetration for <br />the area. Refer to the local building code for details. <br />All footings should be appropriately proportioned to reduce the <br />post construction differential settlement. Footings for large <br />.localized loads should be designed for bearing pressures and <br />footing dimensions in the range of adjacent footings to reduce the <br />y potential for differential settlement. We are available to discuss <br />I this with you. <br />Foundation walls may be reinforced for geotechnical engineering <br />purposes to help provide the walls with additional beam strength <br />and help reduce the effects of slight differential settlement. <br />The structural engineer should be consulted for foundation design <br />tailored for this project. <br />6.1.1 Spread Footings <br />The soil materials encountered in the test borings contained <br />cobbles. Cobbles encountered at foundation depths may apply point <br />loads on the footings. The foundations should be placed on uniform <br />bearing conditions. For this reason we suggest if spread footings <br />are used that they be placed on a compacted blanket of structural <br />fill. The compacted structural fill blanket should be at least one <br />(1) foot thick placed in six (6) to eight (8) inch lifts and extend <br />beyond each edge of the footings a distance at least equal to the <br />fill thickness. This concept is shown on Figure 8. Geotechnical <br /> <br />lambert ana ~,s:sociate.s <br />CDNSUI IJNG GEOTECHNICAI ENGINEERS AND <br />MATERIAL TES i1NG <br />
The URL can be used to link to this page
Your browser does not support the video tag.