Laserfiche WebLink
QCA 124T" ESTATES PARTNERS <br />7/11/02 <br />WATER STORAGE <br />OVERVIEW <br />In our obligation to accommodate the (DMG) with solutions to any concerns regazding <br />the Brighton Water Storage Project, we have laid out a Construction Quality Assurance <br />Plan. The (QCA) plan is as follows. <br />I. The processing and removal of material will begin approximately 8/1/02. <br />u We will screen and haul material from the East % of the azea. (At this time we <br />will lower the water the pond approximately 10 ft) <br />(b) During the initial phase we will not work closer to the property line than our <br />established limits, allowing protection from potential caving of existing <br />structures.(See Sec. II Phase I.) <br />II. The liner will be placed in two phases. <br />Phase I: <br />On approximately January I S to February 15, 2003. At this time we will use <br />627F Scrapers and a D-9 Dozer to remove the usable material from the liner area. <br />At this time, we will lower the water level to the floor of the pond. This activity <br />will coincide with period that the Fulton Ditch will be inactive. We will cut a <br />keyway into the bedrock and build the liner to an elevation above 5022 (the <br />existing water table). The liner material will be removed with from the floor with <br />a D-9 Dozer and 627 Scrapers. Then compacted with a Water Wagon and Disk. <br />Placement will be in 8" compacted lifts. We will begin develop the final slope by <br />adding material to the toe as the liner is completed. <br />