Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 07/14/2004 <br />User : BMK <br />State :Colorado <br />County :Adams <br />Site :Hazeltine Mine <br />Agency or organization name :DMG <br />Permit or otherjob action :NEW 112 APPLICATION <br />Task description :CUT SLOPES TO 311 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />IWATERIAL QUANTITIES <br />Initial <br />volume : 170,000 <br />Basic machine :Cat D8R Series ll - 8SU Horsepower : 310 <br />Blade type : Seml•Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Utiliza8on <br />Ownershipcost/hour: $49.85 NA <br />Operatingcost/hour: $69.48 100 <br />Ripper op.costlhour: $3.85 50 <br />Operator cosVhour: $31.83 NA <br />Total unit costlhour : $155.01 Total fleet cost/hour <br />Pennifrob# :M-2004-031 <br />Abbreviation :none <br />Filename :M031-001 <br />$310.03 <br />Swell Loose <br />CCY factor : 1.125 volume : 191,250 LCY <br />Source of estimated volume :EXI-/IBIT D <br />Source of estimated swell factor :F,CHIBIT D <br />~. ~ x .: <br />.: ~. <br />HOURLY PRODUCTION Job Condition CorcecBon Factors Source <br />Average push distance : 300 feet <br />Unadjusted howdy production : 291.4 LCYlhr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 2.00 % (~ <br />Average site altitude : 5,040 feet <br />Unit cost : $0.981 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing mettwd : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net corcection : 0.54 <br />Adjusted unit production <br />4djusted fleet production <br />(Cat HB) <br />(Cat HB) <br />158.08 LCY/hr <br />Total job time <br />Total job cost <br />Data source : (CRG) <br />316.16 LCY/hr <br /> <br /> <br />604.91 Hours <br />