Laserfiche WebLink
• 2.05.6 Mitigation of the Impacts of Mining Operations <br />(1) Air Pollution Control Plan <br />(1)(aj All permit applications for new operations shall contain a copy of the <br />application for an emission permit and shall be updated accordingly as initial <br />or final decisions are rendered. <br />A copy of the emission permits are presented in Volume III, Exhibit 10, Air <br />Pollution Emission Permits. The emission permits are actually referred to as <br />construction permits. <br />(1)(b) Other than the above referenced air emission permit, no other permit <br />applications are known to be necessary to comply with other applicable <br />State or Federal air quality laws or regulations. <br />• <br />• T~-o 1 <br />2.05 - 61 - 9ntis7 <br />