Laserfiche WebLink
<br />Section 780.18(b) Continued. <br />the event that the final grading occurs more than two weeks prior to <br />soil replacement, the final graded surface will be ripped prior to <br />soil placement. Subsoil will first be reapplied to the regraded land <br />in a thickness designated on Table 59, Soil Redistribution Plan. <br />After the subsoil has been reapplied, the topsoil will be <br />redistributed. Map 32, Kerr Mine Area Soil Redistribution and <br />Revegetation, visually depicts the schedule for topsoil replacement. <br />The reconstructed topsoil profile will be as designated on the same <br />table, and will be graded to assure a uniform and stable thickness <br />that is capable of supporting the proposed postmining land uses. <br /> <br />Following reapplication of subsoil, topsoil, and final grading, the <br />topsoil will be scarified with a chisel plow to alleviate compaction <br />caused by the machinery, and to promote root penetration of the <br />planted vegetation. <br /> <br /> <br />780-70 aaaaaR <br />Revised - January, 1991 <br />