My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120189
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:01 PM
Creation date
11/25/2007 8:16:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1985070
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.03 Legal, Financial, Compliance & Related Information
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.6 Right of Entry and Operational Information <br />• -- <br />The documents shown in Exhibit 1, Right of Entry Documents, show the <br />legal right which Mt. Harris has to enter and use the permit area. This <br />document shows that Mt. Harris leases the surface which it uses in <br />connection with the coal loadout facilities. Lease agreements have been <br />completed with the Denver & Rio Grande Western Railroad for use of the <br />adjacent railroad right-of-way for loadout purposes. <br />2.03.7 Relationship to Areas Designated Unsuitable for Operation <br />The permit-area is not within an area designated unsuitable for surface <br />operation activities as defined in Rule 7 or 30 CFR 764 and 765, or <br />under study for designation in an administrative proceeding under Rule 7 <br />or 30 CFR 764 and 765. <br />2.03.8 Permit Term Information <br />• Mt. Harris has submitted information within this application to cover <br />operations of the loadout facility for a projected production rate of <br />approximately 250,000 tons per year; however Mt. Harris does not <br />anticipate that this production rate to exceed 250,000 during the life <br />of the operation. In fact, production for 1985 and 1986 is projected to <br />be less than 10,000 tons per year. <br />Only approximately 9.75 acres have been affected by Mt. Harris; no <br />additional land is planned to be affected during the entire future life <br />of this operation. The facilities for operation of the coal loadout <br />facilities are shown on the Facilities Map (Map 5). <br />The initial permit term will be for a five year period. Prior to the <br />end of the initial permit term, Mt. Harris will apply for an additional <br />five year permit term. The life of the Mt. Harris coal loadout facility <br />is expected to be for 15 to 20 years depending on coal marketing <br />• conditions. The length of term of operation of the facility will not <br />change the amount of area which will be affected by the facility. Coal <br />2.03-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.