My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120166
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:00 PM
Creation date
11/25/2007 8:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Permit File
Doc Date
1/25/2002
Doc Name
NCCI PIT 1 FN M-2001-107
From
R C ROLLIN CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RC ROLLIN CO~uLTTNG <br />970-454-0404 <br />January 21, 2001 <br />Mr. Thomas A. Schreiner <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />Re: NCCI Pit #1, File No. M-2001-107 <br />Deaz Mr. Schreiner, <br />I have received your adequacy review comments on the above captioned Regular 112 <br />Application and offer the following answers and explanations to the comments. <br />6.4.3 Exhibit C -Pre-_Minine and Minine Plan Mao(sl of Affected Lands <br />I have labeled the Dischazge Ditch From Sand Hill Reservoir on the 3 maps. I have found that <br />the Meadow Island Ditch No. 1 does not enter this property but is on property to the east. <br />6.4.4 Exhibit D -Mining Plan <br />In response to the comment tegazding the discrepancy in the acreage numbers we offer that <br />the acreage should be as follows: <br />Mining azea only - 1 section or portions of 2 sections will comprise 10 acres <br />Total disturbed at one time including stockpiles and processing area - 25 acres <br />In response to the comment regazding the amount of overburden stockpiled at one time we <br />anticipate there will be 62,000 to G6,000 cubic yazds of stockpile at any one time. This is based <br />on a disturbed azea of 15 acres and concurrent reclamation being done. <br />6.4.5 Exhibit E -Reclamation Plan <br />The application is incorrect on page 17. There will be 7 lakes created during the project and <br />these will be lined lakes suitable for water storage for irrigation or exchange purposes as <br />approved by the Division of Water Resottrces. <br />Regazding the thickness of topsoil we will provide topsoil thickness up to 18 inches if the on- <br />site material is available and suitable. We fmd that in many areas of the site the upper material <br />840 EAGLE DRIVE, EATON, COLORAD0180615 <br />
The URL can be used to link to this page
Your browser does not support the video tag.