Laserfiche WebLink
When the pile is filled to capacity, the top of the fill will be graded 2% to 5% to the <br />sides (east west) to promote adequate drainage. Drainage from the top of the fill <br />will not be directed over the outslopes of the fill. When each new bench is <br />constructed, the rough construction face below that point will be completed by <br />grading it to its final configuration and capped with cover material and topsoil. <br />Benches will be graded to the inside at 5% and graded to drain to the sides at <br />2% - 5%. <br />Final reclamation will include completion of the cover material including topsoil, <br />haul road reclamation and completion of the permanent diversion and collection <br />ditches. Revegetation will be in accordance with Volume I, Section 2.05.4. <br />The seed mixture(s) will be hydroseeded or broadcast seeded. Seedbed <br />preparation for all disturbed areas shall consist of extensive roughening by track <br />hoe gouging (pocking). Extensive roughening provides for increased moisture <br />retention and favorable micro sites for plant establishment. <br />All seeded areas will be mulched with certified weed free grass hay or straw. <br />• Approximately two tons of mulch will be used on each acre seeded. Straw or hay <br />will be anchored using a tackifier, netting, or a tackifier mixed with wood or <br />wood/paper fiber. The tackifier will be applied in accordance with manufacture's <br />specifications with consideration of the type and quantity of mulch applied, slope, <br />soil conditions and other applicable factors. <br />I• <br />TR-30 - 12 - 02/04 <br />