Laserfiche WebLink
Conclusicn <br />e area to be disturbed with this <br />will minimize Lt <br />S <br />roject <br />For ease of <br />ermittir~ • <br />eneca i p <br />p <br />. <br />g <br />purposes, the Loral permit a[ea added in this revision was consider_d to b_ disturbed. <br />This, Sn fact, will definitely net be [he case since most of the deadhead routes will only <br />need tc be 60 feet wide. Sere ca also is tr yi rig to co mplete this move before adverse <br />weather conditions start during fall 1956, and to avoid a disruption in stripping plans. <br />Actual Ctaqline MOVe <br />The 650 dragline completed stripping at the Sere ca II Mine cn October e, 1996 and <br />initiated its deadheatl to Yeast cn this same day. The dragline calked across Routt County <br />Road 27 on Surid ay morning, October 13, ar~d reached the drainage under the powerlines later <br />[hat evening. Significant work had to be accomplSShed to lower the boom and replace all <br />the wire ropes to allow the dragline to walk safely under the powerlines without causing <br />damage to the boom. IL crossed under [he powerlines on Eriday afternoon, October 1B, <br />saf el_v and without incident. The 650 reached the Yoas[ mining area on the morning of <br />Octobe[ 22. The move occurred approximately three weeks later than anti ci oared since one <br />additional Wadga pit was stripped, very low overburden, at Seneca II. • <br />Revised Reclamation Schedule and Plans <br />Originally, Se rye ca anticipated that tecLart~ation of the two deadhead roads would be <br />templet ed within three to four weeks followi rig the dragline move. Unfortunately, since <br />the dragline reached the drainage under the powerlines, the weather and subsequent gro~md <br />conditions have not been conducive to proceed or Lo finish the teclama tlon activities on <br />ei Lt,er deadhead road. Since the middle of Cct ober, rain and snow have not allowed the <br />grountl conditions to either dry out or freeze where gtadir,g work could be done in an <br />effective a~a nner. 9ecause cf this, Serer_a is reguesting a delay in completion of these <br />r=clan,=_ticn activities until the string of '_397 to aeproved. °=cause of the existing <br />ground conditions, it does not appear that any grading will occur until after Boring <br />runt.°. <br />P.11 apptoctiate toad berms, silt fence, and hay bates are sCi11 in place to minimize <br />sediment runoff. Construction of the teclai¢ed dta uia ge channel has started, but is not <br />ceme'_ete. A Lertioerary topsoil s*_ocl:pile was consiruci ed jest north of Raul Road ;v Isee <br />ure 11 <br />This to <br />soil will <br />Fi be utilized i^ fECl aiming rte disturbed area adjacen= to <br />p <br />g <br />. <br />Routt Cu.czy Rcad 27, whi c!1 is where th,e topsoil came from . <br /> 13-10-6 Revised 12/20/96 <br />