Laserfiche WebLink
• Table 2.05.3-10-3 Timing of Road and Irrigation Ditch Detours and Restorations <br /> <br />~J <br />Item Description Date <br />1 Leave open slot cut immediately south of BB Road while mining west to <br />eastern edge of 2700 Road End 2000 <br />2 Install BB Road Detour as described in Section 8. Also install power and <br />phone lines along this detour road. Finish by 2nd <br />quarter 2000 <br />3 Mine through BB Road north to West Lateral Ditch. Stockpile asphalt. Mid-2000 <br />4 Install West Lateral Ditch Detour Start 2001 <br />5 Install Enstrom, Wilcox, Johnson access road from Morgan road Start 2002 <br />6 Mine through 2700 Road going west. Stockpile asphalt. Mid 2002 <br />7 Place 2700 Road and BB Road in original locations as a gravel surface. <br />Continue using detour. Restore West Lateral Ditch in permanent pipeline <br />location. Mid 2004 <br />8 Pave 2700 Road and BB Road in original locations and restore Sunshine <br />Ranch Corner intersection. Also lay power and phone lines in original <br />locations. Mid 2005 <br />9 Remove BB Road detour and reclaim road area End 2005 <br />10 Mine west to last cut at western permit boundary ~ End 2010 <br />11 Backfill final cut with overburden stockpile Mid 2011 <br />12 Retopsoil and revegetate final cut area End 2011 <br />13 Replace BB Road from Sunshine Ranch Corner to western boundary. <br />Also re-install power lines and phone lines along road. End 2011 <br />14 Continue to irrigate and monitor reclaimed areas until final bond release. <br />Many areas will be given back to the original owners, especially irrigated <br />areas, much earlier than the date shown here. Start 2022 <br />(Revised 12/00) Attachment 2.05.3(3) -10-107 <br />