My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120020
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:55 PM
Creation date
11/25/2007 8:10:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Collection Ditches, Culverts & Diversion Design Parameters
Section_Exhibit Name
NH2 1996 Section 2.05.3(3) Attachment 2.05.3(3)-10 Part 7
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III I II I II I II IIII III Doc Date:12/11/2001 W ~ ~) ~ U <br />• The horizontal alignment will be consistent with the existing and postmining topography and will <br />be coordinated with the vertical alignment to ensure that the roads will not cause excessive <br />environmental damage. <br />Road cut slopes will not be steeper than 1v:1.5h in unconsolidated material or 1 v:0.25h in rock. <br />Embankment fill slopes will not be steeper than 1v:2.Oh, except where embankment material is a <br />minimum 85 percent rock. Embankment slopes will not be steeper than 1 v:2.Oh unless it has <br />been demonstrated to the regulatory authority that embankment stability will result. The minimum <br />safety factor for all embankments will be 1.25. <br />All vegetation material and topsoil, as determined under 4.06.2, will be removed from beneath the <br />design roadbed, shoulders, and surfaces where associated structures will be placed, and will be <br />stored in accordance with 4.06.3. <br />Embankments will not be constructed on side slopes steeper than 1v:5h or 20 percent unless the <br />existing ground is plowed, stepped or if in bedrock, keyed in a manner which increases the <br />stability of the fill. Material for construction of embankments will come from the vicinity of the <br />mining area and will be non-toxic and of a non-acid producing nature. <br />• Material containing, by volume, less than 25 percent of rock larger than 6 inches in greatest <br />dimension will be spread by scrapers or dozers in successive uniform layers not exceeding 12 <br />inches in thickness before compaction. <br />Embankment layers will be compacted to a minimum of 90 percent of Standard Proctor density or <br />as directed by the engineer to ensure that the embankment is adequate to support the anticipated <br />volume of traffic and weight and speed of vehicles to be used. <br />Material will be placed in an embankment only when its moisture content is within acceptable <br />levels to achieve design compaction. <br />Temporary erosion control measures (ditches, berms, straw dikes, silt fence) will be utilized <br />during embankment construction to minimize sedimentation and erosion until permanent control <br />measures can be established. Immediately upon completion, measures will be taken to stabilize <br />all embankments with vegetation cover or other means as approved by the regulatory authority to <br />minimize erosion. Where a vegetation cover is used, consideration shall be given to providing an <br />appropriate growth medium. <br />Drainage. Each haul road not within areas disturbed by mining and reclamation activities will be <br />designed, constructed and maintained to have adequate drainage using ditches and culverts to <br />(Revised 72/00) Attachment 2.05.3(3) -10-100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.