Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinsr Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />189 State :Colorado PermiUjob # : C-80-007 <br />01/082007 County :Gunnison Abbreviation :none <br />TAK Site :West Elk Mine Filename :0007-189 <br />Permit or ofher job action :Permit Renewal Rn-05 <br />Task description :Replace topsoil from stockpile to dewafering borehole road and pad <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Description <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer :~ <br />Support equipment-Load area :INA <br />-Dump area :~A <br />Road maintenance -Motor grader :INA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $103.51 NA NA NA NA NA <br />Operating wsUhour : $161.32 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />Operator cosUhour : $24.95 NA NA NA NA NA <br />Unit subtotals : $289.78 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $579.56 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $579.56 <br /><,, » ,, <br />:.; <> <:. <br />., <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 778 CCY factor : 1.125 <br />volume : 875 LCY <br />Source of quantity take-off :Division estimate <br />Source of estimated swell factor :CAT Handbook <br />