Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost EstimatinS~ Software <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />180 State :Colorado PermiUjob # : C-80-007 <br />01/08/2007 County :Gunnison Abbreviation :none <br />TAK Site :West Elk Mine Filename :0007-180 <br />Permit or other job action :Permit Renewal Rn-05 <br />Task description :Replace topsoil from stockpile to french drains and frenches <br />,. <br />;: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer :~NA <br />Support equipment -Load area :INA <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA _ _ <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper1 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />OwnerhipcosUhour: $103.51 NA NA NA NA NA <br />OperatingcosUhour: $161.32 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $289.78 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $579.56 Support : $0.00 Maintenance : $0.00 <br />