Laserfiche WebLink
.. ;. <br />,: .. ,: <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity <br />Basis <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth -Dry packed <br />Rated payload : 75,000 pounds <br />Payload capacity : 29.41 LCY <br />Bowl (volume) Basis : <br />Struck volume <br />Heaped volume <br />Average volume <br />Adjusted rapacity <br />21.00 LCY <br />31.00 LCY <br />26.00 LCY <br />26.00 LCY ~~~ <br />hourly production reflects volume per svaper pair on push-pull models <br />Cvcle Time : ob Condition Corrections : Site altitude (ft.) : 6,300 <br /> Scraper Push dozer Source <br />Scraper loading time ~ : 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />' loatl time per scraper pair on push-pull motlels Net COrfeCflOn : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)~' <br />1 550 -2.70 5.00 2.30 2939 0.45 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />