My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119918
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:52 PM
Creation date
11/25/2007 7:53:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
3/9/2007
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />r1 <br />U <br />• <br />2.05.3 <br />(a)(vii) Blasting will be conducted in accordance with the following equation. The <br />maximum weight of explosives to be detonated within any 8-millisecond <br />period will be determined by the formula W = (D=Dg)2 where W =the <br />maximum weight of explosives, in pounds, that can be detonated in any 8- <br />millisecond period; D =the distance, in feet, from the blast to the nearest <br />structure, dwelling, public building, school, church, community or institutional <br />building; and Ds =the scaled-distance factor which is 55 for distances from <br />the blast site of 301 to 5000 feet and 65 for 5001 feet and beyond. <br />To meet the maximum allowable peak particle velocity for ground vibration <br />contained in Rule 4.08.4(10), for a distance D from the blasting site of 800 <br />feet, the Operator will not detonate more than 212 pounds of explosives <br />within any 8-millisecond period. <br />(viii) The applicant does not propose a permanent explosive storage area for the. <br />site. The contractor responsible for the construction of the site will have a <br />temporary explosive storage area. The applicant, for the short term, will rely <br />on the Bowie No. 1 Mine for an explosive storage area. <br />(~) <br />TR-27 <br />Coal Handling Structures <br />A narrative of the coal handling structures is presented above in Section <br />2.03.3(3)(a). The following coal handling structures are discussed. <br />1. Portal Conveyor Transfer Buildings <br />2. Stacking Tube <br />3. Reclaim Tunnel <br />4. Screen and Crusher Building <br />5. Transfer Conveyor <br />6. Downhill Conveyor Transfer Building <br />7. Downhill Conveyor <br />8. Stacking Tubes <br />9. Reclaim Tunnel <br />10. Reclaim Conveyor <br />11. Reclaim Transfer Building <br />12. Loadout Conveyor <br />13. Loadout Structure -Batch Weigh System <br />Drawings of the coal handling structures are presented in Volume V. <br />2.05 - 44 - <br />8/03 <br />/3 PPRcvc-~ <br />`~'~1~~03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.