My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-30_PERMIT FILE - C1981008A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2007-07-30_PERMIT FILE - C1981008A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:38 PM
Creation date
11/25/2007 7:43:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
7/30/2007
Doc Name
San Miguel Power Cost Estimate for Power Line Installation
Section_Exhibit Name
Section 3.02.2 Attachment 3.02.2-4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />SAN MIGUEL POWER ASSOCIATION, IN"C,~.. <br />A Tourhttone Fiiergl+Cooperative ~+. <br />Cos[ Estimate for Western Fuels Co. of Colorado <br />Enstrom Tan/Salazar Ro-budd <br />Aueust 8.2006 <br />This is a "good faith" estimate, not a bill. It is used as a deposit applied to the actual cost of the <br />job. SMPA's line extension policy requires that an applicant pay the actual cost of atry line <br />extension or conversion of the elosting system. The actual cost will be determined after <br />completion of the job. Tf the actual cost is less than the deposit, SMPA will refund the difference. <br />If the cos[ is more than the deposit, SMPA will bill for the difference. <br />SMPA Work Order <br />Materials....... <br /> <br />Labor & Engineering...... <br />Equipment ..................... <br />Cormect/DepositFegi ..................................... <br /> <br />Facility Reinforcement Fee .....................................................................SN/A <br />Total Estimated Cost._ .................._.....................$65,705.00 <br />Before acheduling can occur all estimated costs must be paid. Scheduling of the work to be <br />done must be coordinated with our Tine supervisor, Paul Enstrom. Paul can be reached by <br />calling ow Nucla office at (970)864-7311 or calling his cell phone at (970)729-] 585. <br /> <br />HeeCgwroere <br />9oi 877, HYCIa. Cobrado 61124 <br />67LL669-7311 •67P681-7297 FM <br />(Revised August 2006) <br />aox 547, TellurlW, CdweUO 910.15 90% 1150, alEywey, CdonCO 61432 Boa 119, Sllvertal, Coloratlo 81433 <br />9/1WZ&3exs•81o-7x&5297 FU 9]Pfi165549.970.6265689 FAt 971F397-SI11.870.397-5711 xa <br />Attachment 3.02.2-3 <br />........$la,7os.oo <br />.......$41,000.00 <br />.......................................... $10, 000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.