Laserfiche WebLink
<br />SAN NIIGUEL POWER <br />A Twdluone <br />August 8, 2006 <br />Western Fuels Co. of Colorado <br />Boz 628 <br />Nucla, CQ 81424 <br />Attn: Ross Gubka <br />Ross: <br />INC. <br />Enclosed is the estimated cost for re-building the overhead power lines from Ward <br />Burbridge West to Enstrom's (single phase) and North and East to Salazar's (three <br />phase). The estimated cost must be paid before the materials ere ordered and scheduling <br />of consmrction can occur. <br />• <br />Included in this estimate are the costs of materials, labor and engineering. As this is an <br />estimate, please be aware that the actual costs are determined upon completion of the job. <br />The actual costs will reflect any design or field changes that may occur. The estimate is <br />based on today's costs for material and labor. This estimate is also based on using San <br />Miguel Power employees for the labor. If a wnhador is used, the labor costs will likely <br />need to be increased. If the actual wst is less than the estimated amount, SMPA will <br />refund the difference. However, if the actual cost is over the estimate, SMPA wdl bill <br />you for the difference. <br />You will be responsible for providing access and site prepazation, if needed. You will be <br />responsible for meeting all of SMPA's specifications for installing an overhead power <br />system. You will be responsible for any permits or easements as required, <br />If you have any questions please feel free to contact me at our Nucla Office, phone <br />(970)864-7311. <br />Sin y, <br />~~ vv <br />Marvin Walisky <br />San Miguel Power Association <br /> <br />noaa9uxnwx <br />eax en, nua>ti caorxao ataz~ <br />Wa-0a4TJ11 •9T0-95C.Tt57 w <br />(Revised August 2006) <br />Box SQ, TsBUritlo, Cdorado 810.15 Box 1150, aidgway, Coloraoo B1C32 Box H9, SlNenan, rA10•eC0 810.U <br />9]6]28-0M5.976T2&5281 r.x 97abR5&SC9.9Tafi265688 rxx 974aB1d711•W030Td711 vx <br />Attachment 3.02.2-2 <br />