My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119789
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:47 PM
Creation date
11/25/2007 7:41:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
2/14/2003
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dorchester constructed an auxiliary water treatment system consisting of mixing, <br />settling and sampling tanks with the intent of treating process water and/or <br />dewatering discharge to reduce suspended solids and iron. While the treatment <br />facilities exist, they were never utilized and there are not plans for future auxiliary <br />water treatment. <br />Coal Stockpiling and Transportation. EFCI maintains separate, open stockpiles <br />of coal products including raw (run-of-mine) coal, sized stoker and nut coal, and <br />industrial (2x0") coal. Permitted capacities of the raw and clean coal products are <br />discussed later in this section. Actual stockpile volumes may be significantly less <br />than permitted capacity and vary with operational, transportation and market <br />factors. These stockpiles are located in the mine facilities area as shown by the <br />Mine Surface Facilities Map (Map 18). <br />A wheel loader is utilized to reclaim coal from the stoker coal stockpile and load <br />rear-dump haulage trucks for coal deliveries to residential and small industrial <br />customers within the local area. A reclaim tunnel runs beneath the clean industrial <br />coal stockpile and coal can be withdrawn through several draw points to load <br />tractorftrailer haulage units directly. From the mine,the haulage units transport the <br />coal to the Southfield loadout or the regional customers. <br />All coal haulage is handled by independent contractors, although EFCI is <br />responsible for loading haulage units. Before haulage units leave the mine <br />property, they are weighed and may be randomly sampled to ensure product <br />quality control. While EFCI maintains records on belt scale tonnages of raw coal <br />feed to the preparation plant and clean coal product from the preparation plant, <br />limitations on belt scale accuracy dictate that the more accurate truck scale <br />records be utilized as the basis for reporting mine production and sales. <br /> <br />2.05.3-16 Revised 4/15196 <br />Minor Revision No. 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.