Laserfiche WebLink
Page # ~ • <br />3. Maps: <br />a. Exhibit C should clearly show the boundary of the affected land. <br />b. The vegetation map should show each vegetation type and the <br />boundaries of the affected lend. <br />c. If you intend to combine Exhibits C and F be sure the final <br />contours are clarly shown for all affected land. This is particularly <br />crucial in the waste dumps. <br />4. Reclamation Plan: <br />The reclamation plan should be more specific in nature. Each area <br />of surface disturbance outlined in the mine plan and shown on the maps <br />s':~ould Le addressed in the reclamation plan with the specific measures <br />to bu taken to reclaim each disturbance. <br />a. T.ie final confi6uration of both waste dumps should be disscussed <br />including ~l~ecific reclamation techniques to be used. <br />~. <.11 soil ac:endr,.euts, mulches sad other details o~ tae revegetation <br />scheme saouiu ue presented. <br />c. ilo you i::tead to stockpile the topsoil or will reclamation be an <br />ongoing process? If stockpiling is anticipated, tiie location sad <br />timing of t_icde stockpiles should be given. <br />d. W!iy are lu acres of your original permit area r:ottbe be reclaimed. <br />e. Water impomidments are referenced in the recla.:«tion plan out sot in <br />the mine plan. <br />f. i!o reclamation tiuetable Baas included. <br />g. The seed-mixture presented in the application look a bit li;;:rt <br />in terms of coverage. If you have questions concerning tail, give me <br />a call. <br />5. Source of Legal Right to Enter: <br />As I indicated on December~2, the source of legal right to enter is nut <br />adequate in its present form. <br />Please call me if you have any further questions concerning this matter. I <br />appreciate your continuing cooperation. <br />3incarely, <br />lloean R. Massey <br />Reclamation Specialist <br />DRM:pae <br />