My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119771
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:47 PM
Creation date
11/25/2007 7:39:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Permit File
Section_Exhibit Name
ATTACHMENT A REPRESENTATIVE PIT LINER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
went By: TUTTLE APPLEGATE INC ' U; 3034522759303452fi611;May-2-0:37; Page 12!73 <br /> <br /> <br />,:. Roads <br />1. Demo and remove, 9000 SF x 8" <br />2. Topsoil (6" dcplh) <br />3. Scarify <br />4. Seed <br />F. Processing plant (Equipment is portable and <br />would be removed by the operatvrJ <br />1. Move the surge pile into the settling basin <br />2. Wash plan[, remove concrete pad, 20' x 20' x t' <br />3, Asphalt plant, remove concrete pad, 80' x 20' x 1' <br />4. Concrete plant, remove concrete pad, 50' z 20' x l' <br />5. Shop, demo and remove, 2000 SF x 20' <br />G. Office, remove concrete footings <br />7. Scale, remove concrete base <br />8. Topsoil (6" depth) <br />9. Scarify <br />lU. Seed <br />11. Reseed <br />G. Lakeshorefnalgraded with topsoil <br />1. Scarify <br />2. Seed <br />3. Reseed <br />H. Lakeshore Seeded <br />1. Reseed <br />Qty Units Unit Cost Cost <br />G000 CF $ 0.05 $ 300.00 <br />167 CY $ 1.25 S 208.75 <br />0.2 AC $100.00 $ 20.00 <br />0.2 AC $750.00 $ 150.00 <br />Qty Unite Unit Cost Coat <br />1000 CY $ 1.25 $ 1,250.00 <br />15 CY $ 65.00 $ 475.UU <br />h0 CY $ 65.00 $ 3,900.00 <br />37 CY $ 65.00 $ 2,405.00 <br />40000 CF $ 0.05 $ 2,000.00 <br />8 CY $ 65.00 $ 520.00 <br />l0 CY $ 65.00 $ 650.00 <br />15325 CY $ 1.25 $1 9,156.25 <br />27 AC $100.00 $ 2,700.00 <br />27 AC $750.00 $20,250.00 <br />9 AC $750.00 $ 6,750.00 <br />Qty Units Unit Cost Cost <br />2 AC $100.00 $ 200.00 <br />2 AC $750-00 $ 1,500.00 <br />0.7 AC $750.00 $ 525.00 <br />Qty Unlts Unit COSt Coat <br />0.7 AC $750.00 $ 525.00 <br />Description Item Cost <br /> <br />Disturbance Cost Total $ 582,000.00 <br />Cotthactor MOB/D6MOB(8.0%) S 46,560.00 <br />Overhead (18.5%) $ 107,670.00 <br />Administrative (5.0%) $ 29,100.00 <br />Total Proposed Bond $ 765,330.00 <br />Disturbed Acreage (Acre) bl <br />Bond Cost Per Acre ($/Acre) S 12,550.00 <br />0 <br />L-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.