My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119703
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:44 PM
Creation date
11/25/2007 7:32:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
6/15/2006
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PROJECT IDENTIFICATION <br />Agency or org; <br />Task # : 401 <br />Date : 06RM200s <br />User: TAK <br />CIRCES Cost Estimation Software <br />TRUCKING • ONLY WORK <br />mization name : COMG <br />State:COlorado PermiVjob#:C-81-035 <br />^_ Counry:la Plata Abbreviation :none <br />Site:King COal Mine Filename :C035-401 <br /> Total unit wsuhour: $83.96 Total Fleet costlhour: $167.92 <br /> MATERIAL QUANTITIES~~ <br /> Initial Swell Lo05e <br /> volume: 50,000 LCY factor: NA volume: 50,000 LCV <br /> Source of quantity take-off :OperatoYS cost estimate <br /> Source of estimated swell faclor :NA <br />• <br /> Material purchase cost : $0.00 /LCY Total cost: $0 <br /> HOURLY PRODUCTION~~~ <br /> Hauling CaoaciN <br /> Truck Payload (weight) Basis : Truck Bed (volume) Basis <br /> Material weight: 2,900 pountls/LCY Struck volume: 1500 LCY <br /> Matenal description : Heaped volume : 18.00 LCY <br /> Decomposed rock-50%ROCk, 50%EaRh Average volume: 16,50 LCV <br /> Rated payloatl: 83,980 pountls <br /> Payload capacity: 22.06 LCY Adjusted volume: 16.50 LCY <br /> Source <br /> Truck CvGe Time : F~rchange time (min.) : 0.50 (Cat HB) <br /> Load time (min.) : 250 (Cat H8) <br /> 0.20 mile haul [rip at : 20.0 mph (avg.) = Haul time (min.) : 0.60 (mi./mph)x60 <br /> Dumptime (min.): 0.90 (Cat HB) <br /> 0.20 mile return trip at : 20.0 mph (avg.) = Return time (min.) : 0.60 (mi./mph)x60 <br /> <br /> Total cycle time : 5.10 minutes <br /> Job ContliBOn Correction Factors <br /> <br /> Average site altltutle: 7,300 feet dusted HOUn Truck Production: <br /> Altitude adjustment factor: 1.00 (Cat HB) <br /> Job efficiency fadoc 0,83 /1 shiNday) Unadjusted Unit production : 194.12 LCY/Hour <br /> Adjusted unit production : 161.12 LCY/Hour <br /> Net job correction: 0.83 Adjusted fleet production : 322.24 LCV/Hour <br />' <br />' <br /> JOB COST 'i! ':. ..... ... s!: . ~::>. s. .. <br />s <br />- <br />. Fleet size: 2 Truck(s) Total job hme: 155.17 Hours <br /> Unit cost: 80.521 /LCY Total job cost: $26,056 <br />
The URL can be used to link to this page
Your browser does not support the video tag.