My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119703
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:44 PM
Creation date
11/25/2007 7:32:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
6/15/2006
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatins~ Software <br />• <br />PROJECT IDENTIFICATION <br />Task # : 400 <br />Date : 06/04/2006 <br />User : TAK <br />State : Coloratlo <br />County : La Plata <br />Site : King Coal <br />Agency or organization name : CDMG <br />Permit or other job action : PR-8 <br />Task description : Re-establish SW <br />HOURLY EQUIPMENT COST <br /> Machine description :Cat 322C L Horsepower : 162 <br /> Weight (MT) : 24.19 <br /> Cost Breakdown : Utilization <br /> Ownership cosUhour : $29.53 NA Shift basis : 1 per day <br /> Operating cosUhour : $39.00 100 Data source : (CRG) <br /> Operator cosUhour : $32.72 NA <br /> Total unit cosUhour : $101.25 Total fleet cosVhour : $101.25 <br /> _: <br /> <br />MATERIAL QUANTITIES : <br />.. <br /> Initial Swell Loose <br /> volume: 50,000 CCY factor: 1.165 volume : 58,250 LCY <br />• Source of estimated volume :Operator's cost estimate <br /> Source of estimated swell factor : DMG estimate <br /> HOURLY PRODUCTION <br /> Excavator Cvcle Time (load bucket swing loaded dump bucket swing emoN) <br /> Basic job condition description : AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.29 minutes <br /> Bucket Caoacitv <br /> Rated bucket capacity : 1.44 LCY (heaped) Bucket size class : medium <br /> Bucket fill factor : 0.97 Sand and grave! (95% - 100%) <br /> Adjusted bucket capacity : 1.40 LCY <br /> Job Condition Correction Factors Source <br /> Site altitude : 7,300 feet Altitude adjustment : 1.00 ~ (Cat NB) <br /> Job efficiency adjustment . 0.83 (1 shilt/day) <br /> Net job correction : 0.83 multiplier <br /> <br /> Unadjusted hourly unit production : 287.51 LCY/hour <br /> Adjusted hourly unit production : 238.63 LCYlhour <br /> Adjusted hourly fleet production : 238.63 LCY/hour <br />• JOB TIME AND COST <br /> Fleet size ; i excavator(s) Total job time : 244.10 hours <br /> Unit cost : $0.424 per LCY Total job cost : $24,714 <br />Permitfjob # :C-81-035 <br />Abbreviation :none <br />Filename : C035-400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.