Laserfiche WebLink
<br />Exhibit E <br />Notes for Exhibit E maps <br />On the mine plan map, it is indicated that the fence on the east side of the pit will be <br />mined through. The fence will be moved prior to mining the area, and after mining <br />is complete, it will be placed back on the property line. <br />On the reclamation plan map, the average thickness of topsoil and overburden that <br />will be replaced on the site will be 6 inches. <br />