Laserfiche WebLink
• <br />• <br /> <br />North Thompson Creek Mines <br />Disturbed Areas Acres DimensionsMotes Date Reclaimed <br />Mine Sites <br />No. 1 Mine 21.6 3.4 Permanent 1987 <br />Refuse Pond 1.3 Permanent <br />Pond P-9 0.4 Permanent <br />Refuse Pile 8.0 1986 <br />No. 3 Mine 4.4 1987 <br />No. 3 Mine Pipeline To No. 1 Mine 0.3 Permanent <br />Water Tank 1.4 1987 <br />No. 1 Mine Fan Site 0.8 1987 <br />Reclaimed Pond P-1 0.1 1994 <br />Reclaimed Pond P-3 0.7 1994 <br />Reclaimed Pond P-4 0.1 1994 <br />Reclaimed Pond P-6 0.6 1994 <br />Reclaimed Pond P-6 0.3 1994 <br />Reclaimed Pond P-7 & 8 0.5 1994 <br />Subtotal Ponds - - -- -- - ~ -- 2.3 ~ - Acres - - ~- <br />Truck Scales 0.2 1987 <br />Flumes 2 North & 2 Middle Thompson 0.2 1986 <br />Stoney Ridge Power Line 1.3 3740 15 1987 <br />Stoney Ridge Fan Site 0.1 1987 <br />Sloney Ridge Road 5.3 15370 15 Permanent <br /> <br />Tolal Mine Site 47.6 <br />Reclaimed 1986 Refuse Pile 8.0 <br />Flumes to be Reclaimed <br />Reclaimed 1987 0.2 <br />29.8 <br />3.4 <br />Permanent <br />Reclaimed Ponds 1994 2.3 Permanent County Road Ditch <br />Permanent 7.3 <br />Total Mine Site 47.6 <br />Loadout <br />Paved Road to Prime Farmland 9.2 10000 40 Permanent <br />Paved Truck Dump 0.9 270 150 Permanent <br />Topsoil & Stockpile Areas 3.7 Permanent <br />Slope Below Truck Dump 0.5 400 50 1987 <br />Conveyor Corridor Bench 1 0.7 700 50 1987 <br />Conveyor Corridor Bench 2 0.6 600 50 1987 <br />Subtotal Reclaimed at Loadout 1.8 Acres <br />Total Loadout 16.6 <br />Total Acres Disturbed Mine 8 Loadout 63.2 63.3 <br />3/02 <br />"Reclaimed then Converted to Permanent 3.6 <br />Permanent 21.1 <br />Total Permanent 24.6 <br />4-ix <br />