Laserfiche WebLink
<br />The area to be mined will first be cleared of topsoil as <br />mentioned before leaving a generally flat pit bottom. All <br />processing and stockpile activity will be in this area. Mining <br />will commence in the Southwest corner of the site and proceed <br />generally Northeast. <br />As sections of the site are depleted of gravel, that protion <br />will be reclaimed using stockpiled topsoil. High walls well be <br />sloped to 9 to 1 and covered with topsoil. Reseeding in native <br />and introduced species will complete the reclamation. <br />Dust control water is used on the site only when conditions <br />require such control. No water utilized for dust control is dis- <br />charged from the site. During storm periods, no dust control <br />water is applied and is not availabe for runoff. <br />Observation of stormwater on April 3 and 4, 1996 indicated <br />no run off from site. <br />A map of the site is attached as part of the stormwater <br />Management Plan. <br />Mr. Bob Sutherland will be responsible for the stormwater <br />Management Plan, implementation of the plan and ongoing <br />maintenance and revision of the stormwater Management Plan. <br />