My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119625
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:41 PM
Creation date
11/25/2007 7:24:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996031
IBM Index Class Name
Permit File
Doc Date
4/18/1996
Doc Name
WEIMER GRAVEL PIT 2 MONTROSE CNTY
From
SUTHERLAND BROS INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />EXHIBIT C <br />to that certain <br />Limited Impact Operation (110(2)) <br />Reclamation Permit <br />• Application Form <br />SUTfIERLAND BROS. , INC. <br />MINING PLAN <br />Received <br />r,rh ~. 619 <br />C7r~::a.i c : L'.:..,: w : 4 Goolopp <br />1. Mining will commence May 15, 1996 and continue <br />until July 31, 2021: <br />2. 'The operation will commence with the removal of the <br />topsoil on each two (2) acre phase to a maximum depth of <br />approximately six inches (6"). The topsoil will be placed in <br />a separate topsoil stockpile on the mine site with slopes of <br />3:1 or less. All topsoil removed will be used for reclamation <br />of the site after mining. No topsoil will be removed from the <br />mine site. The stockpile of topsoil will be seeded with crested <br />wheatgrass seed for stabilization. Because of the lack of <br />nutrients in the topsoil, the stockpiled material will not <br />support the growth. of other high nitrogen-consuming grasses. <br />Tlie initial stockpiled topsoil will be used to reclaim the <br />initial area disturbed within twelve (12) months of removal. <br />3. There is no overburden on the mine site. <br />4. The gravel to be mined is ten feet (10') in thickness. <br />'T lie maximum highwall height will be ten feet (10') et the point <br />when gravel is moved from the thickest part of the deposit. <br />The final highwall will be graded to a slope not exceeding 3:1 <br />for stabilization end reclamation. <br />5. Access to the operation site is through existing roads. <br />The only major component on the site will be a crushing and <br />screening plant. There will be no other structures or buildings <br />on Clie site. A scraper and a bulldozer will be utilized to <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.